Beyond Compliance: The Long-Term Benefits of Regular Arc Flash Studies
Electrical safety is a top priority in any industrial setting. Compliance with regulatory standards is not only mandatory but also essential for safeguarding your workforce
Service Availability
Customer Service
Pioneer Power Group was contracted to perform a short-circuit study for an apartment complex. The system contained an automatic transfer switch (ATS) fed by the utility via an upstream panel on the normal power side, and by a generator on the emergency power side.
ATS short-circuit withstand and closing ratings (WCR) determine what fault current levels are acceptable for an ATS. However, unlike other low voltage gear, the ATS WCR is dependent on the protective devices immediately upstream of the ATS. These ratings are typically obtained one of three ways:
Often, the Engineer of Record (EOR) does not specify the gear required to properly rate an ATS. This can result in ATSs and upstream distribution gear being included into a system without consideration of the ATS ratings listed above. In order to properly rate the ATS, the suitability of the upstream protective devices must be examined.
Pioneer Power Group modeled the distribution system in SKM PowerTools software and consulted the manufacturer submittal information to confirm whether the proposed breakers met the requirements for the ATS’s WCR. PPG’s engineer determined that the breakers upstream of the ATS were not suitable to rate the ATS.
Though the initial design failed to meet the ATS manufacturer’s requirements, our study engineers understood that there were creative ways to produce a protection scheme that met the manufacturer’s requirements. Pioneer Power Group collaborated with the customer and manufacturer in selecting current limiting fuses for upstream disconnects that met the manufacturer’s requirements. After updated submittal documents were provided, the study was completed with proper protection for the ATSs.
By completing a short-circuit analysis and understanding the requirements of ATS manufacturers, Pioneer Power Group was able to ensure that the equipment being supplied was protected without costly and time-consuming redesign. PPG’s engineers conduct these assessments before report submittals, so that potential issues can be resolved early and as quickly as possible, thereby saving our customers time, money, and frustration. Pioneer Power Group is focused on helping our customers to understand such complex protection discrepancies, and to highlight which options are best to resolve them.
Electrical safety is a top priority in any industrial setting. Compliance with regulatory standards is not only mandatory but also essential for safeguarding your workforce
In the ever-evolving landscape of industrial safety, it is crucial for companies to stay ahead of the curve and adopt the latest industry practices. One
In the ever-evolving world of electrical safety, staying up to date with the latest standards and regulations is crucial for businesses. Arc flash incidents are a significant concern in various industries, posing serious risks to personnel and equipment. To mitigate these risks, it is essential to adapt to modern electrical safety standards, and one key tool in this process is the Arc Flash Study. In this article, we will explore the importance of Arc Flash Studies and their role in ensuring a safe and compliant working environment.